V. Ershov.

The article presents the results of the investigation of options performed by the engineering department of ZAO Svetly. This investigation was aimed at the identification of the optimal solution for the efficient development of a deep placer in the Nygri valley (Lena goldfield) with an excavator-dredge system.

You have no rights to post comments

Videos

2017joy global

Первая поставка и сборка самосвалов Terex TR100

SANDVIK Mining

Blast hole tamping device WL 36-53

Experience in Braås - Interview with Martin Lundstedt and Martin Weissburg

ЧЕТРА Т40: самый мощный российский бульдозер на тест-драйве

­