A.V. Chmyrev, P.H. Glendinning

The authors prove that the establishment of the in-plant closed-cycle water circulation system at the OAO KMAruda ore dressing facility has significantly enhanced safety-in-operation, irrespective of external factors, and substantially reduced iron-ore concentrate production costs due to the lower costs of tailing disposal and water recycling.

You have no rights to post comments

Videos

2017joy global

Первая поставка и сборка самосвалов Terex TR100

SANDVIK Mining

Blast hole tamping device WL 36-53

Experience in Braås - Interview with Martin Lundstedt and Martin Weissburg

ЧЕТРА Т40: самый мощный российский бульдозер на тест-драйве

­