M. Pikhler, A.N. Pan’kin, A.A. Filippov, Yu.B. Pankevich, M.Yu. Pankevich

The article describes geological and mining conditions of dolomite and dolomitic limestone mining at the Melikhovo-Fedotovskoe deposit. The authors present characteristics of a pilot site for dolomite continuous mining technology testing. The description is also provided of the objectives, recommended practice and results of carbonate rock pilot mining by the Wirtgen 2200 SM machine. The authors offer recommendations and conclusions on the transfer from drilling and blasting technology to continuous mining methods of deposit development.

Mining Industry Journal №6 (100) 2011, p.44

Comments  

# dr g.k.pradhan 2012-07-27 21:06
Technique is fast picking up in Indian coal, limestone and bauxite mining.India has the largst population of surface miners in the world.

You have no rights to post comments

Videos

2017joy global

Первая поставка и сборка самосвалов Terex TR100

SANDVIK Mining

Blast hole tamping device WL 36-53

Experience in Braås - Interview with Martin Lundstedt and Martin Weissburg

ЧЕТРА Т40: самый мощный российский бульдозер на тест-драйве

­