Cutting ore concentrate production costs due to the establishment of the in&plant water circulation system: OAO KMAruda case study

  A.V. Chmyrev, P.H. Glendinning

The authors prove that the establishment of the in-plant closed-cycle water circulation system at the OAO KMAruda ore dressing facility has significantly enhanced safety-in-operation, irrespective of external factors, and substantially reduced iron-ore concentrate production costs due to the lower costs of tailing disposal and water recycling.