The article presents In conditions of gold mines GIT-52MB screens specifically designed for operation at gold placer deposits show at least 800 t hourly capacity, in some cases the size of lumps may exceed 1 m. The description is given of design features and process details of the screen, which provide for its enhanced operational reliability. GIT-52MB screens are successfully used in conjunction with PV-PBR-1,2/2,7 shaking feed hoppers for the development of technogenic deposits and dredge tailing piles.

You have no rights to post comments

­