Abstract: Underground mining of solid minerals inevitably involves water ingress into the mine workings, which requires the mandatory use of dewatering systems. Since the mid-2000s, single-flow section pumps of the NCS and NCSK series, which have enhanced wear resistance and the ability to pump water with harsh physical and chemical characteristics, have been widely used in the underground mine dewatering systems in the Russian Federation. However, operation of the NCSK series pumps at kimberlite mines in Western Yakutia when pumping highly abrasive and aggressive water has shown that their design time between overhauls is too long compared to their actual endurance. The least reliable element in the design of section pumps is the discharge unit (the balancing ring), which accounts for up to 90% of all failures when working with aggressive and abrasive media. The aim of the study is to develop a set of measures to improve the efficiency of discharge units of the pumps operated in difficult geological conditions. Based on the results of the research, a mathematical model has been developed to calculate the durability of balancing rings when the pump equipment is used to pump highly abrasive and aggressive water. Recommendations are given on the fault detection procedures for worn-out balancing rings and on justification of their operating strategy.

Keywords: de-watering, water ingress, pumping equipment, section pumps, de-watering unit, balancing ring

For citation: Ovchinnikov N.P., Zyryanov I.V. Managing the efficiency of the section pump discharge unit. Russian Mining Industry. 2025;(4S):55–58. (In Russ.) https://doi.org/10.30686/1609-9192-2025-4S-55-58


Article info

Received: 29.06.2025

Revised: 13.08.2025

Accepted: 18.08.2025


Information about the authors

Nikolay P. Ovchinnikov – Cand. Sci. (Eng.), Associate Professor, Director of the Institute of Mining, M.K. Ammosov North-Eastern Federal University, Yakutsk, Russian Federation

Igor V. Zyryanov – Dr. Sci. (Eng.), Professor Department of Mining Engineering, Mirny Polytechnic Institute (branch) of M.K. Ammosov North-Eastern Federal University, Mirny, Russian Federation


References

1. Guzy A., Malinowska A.A. Assessment of the impact of the spatial extent of land subsidence and aquifer system drainage induced by underground mining. Sustainability. 2020;12(19):7871. https://doi.org/10.3390/su12197871

2. Guzy A., Witkowski W.T. Land subsidence estimation for aquifer drainage induced by underground mining. Energies. 2021;14(15):4658. https://doi.org/10.3390/en1415465858

3. Rybnikova L.S., Rybnikov P.A., Smirnov A.Yu. Flooding of open pit and underground mines in the Chelyabinsk coal field: consequences, problems and solutions. Journal of Mining Science. 2023;59(3):497–504. https://doi.org/10.1134/s1062739123030171

4. Buckley R.S., Spagnuolo E.K. Techno-economic assessment of underground mine dewatering systems. In: Andrieux P., Cumming-Potvin D. (eds). Deep Mining 2024: Proceedings of the 10th International Conference on Deep and High Stress Mining, Australian Centre for Geomechanics. Perth; 2024, pp. 1481–1494. https://doi.org/10.36487/ACG_repo/2465_97

5. Бражник О.И., Руденко А.А. Результаты опытно-промышленных испытаний секционного насоса GP-200/11X500-M. Горная промышленность. 2020;(6):53–55. https://doi.org/10.30686/1609-9192-2020-6-53-55Brazhnik O.I., Rudenko A.A. Pilot test results of GP-200/11X500-M stage chamber pump. Russian Mining Industry. 2020;(6):53–55. https://doi.org/10.30686/1609-9192-2020-6-53-55

6. Gabbasov B.M., Kurochkin A.I., Mazhitov A.M., Kornilov S.N. Investigating external and internal working processes of mining machines when operating on “Unclarified” water in underground conditions. Vysshikh Uchebnykh Zavedeniy. Gornyy Zhurnal. 2021;(6):13–23. https://doi.org/10.21440/0536-1028-2021-6-13-23

7. Зотов В.В., Мнацаканян В.У., Базлин М.М., Лакшинский В.С., Дятлова Е.В. Повышение ресурса рабочих колес центробежных насосов шахтного водоотлива. Горная промышленность. 2024;(2):143–146. https://doi.org/10.30686/1609-9192-2024-2-143-146Zotov V.V., Mnatsakanyan V.U., Bazlin M.M., Lakshinsky V.S., Dyatlova E.V. Extending the service life of centrifugal dewatering pump impellers in mines. Russian Mining Industry. 2024;(2):143–146. (In Russ.) https://doi.org/10.30686/1609-9192-2024-2-143-146

8. Долганов А.В., Ислентьев А.О., Торопов Э.Ю., Чураков Е.О. Анализ эффективности разгрузочных устройств шахтных центробежных секционных насосов. Известия Уральского государственного горного университета. 2014;(2):31–35. Режим доступа: https://iuggu.ru/download/2014-2-Dolganov.pdf (дата обращения: 01.07.2025).Dolganov A.V., Islentyev A.O., Toropov E.Yu., Churakov E.O. Analysis of effectiveness of dumping devices of mine centrifugal sectional pumps. News of the Ural State Mining University. 2014;(2):31–35. (In Russ.) Available at: https://iuggu.ru/download/2014-2-Dolganov.pdf (accessed: 01.07.2025).

9. Овчинников Н.П. О контроле за техническим состоянием узла гидравлической пяты секционного насоса. Горный информационно-аналитический бюллетень. 2023;(10):56–73. https://doi.org/10.25018/0236_1493_2023_10_0_56Ovchinnikov N.P. Technical control of multistage pump balance ring. Mining Informational and Analytical Bulletin. 2023;(10):56–73. (In Russ.) https://doi.org/10.25018/0236_1493_2023_10_0_56

10. Тимохин Ю.В., Паламарчук Т.Н. Результаты исследований осевой силы ротора и параметров автоматических уравновешивающих устройств центробежных секционных насосов. Сборник научных трудов Донецкого института железнодорожного транспорта. 2017;(45):32–42.Timohin J.W., Palamarchuk T.N. The research results of the axial forces of the rotor and automatic settings. Sbornik nauchnykh trudov Donetskogo instituta zheleznodorozhnogo transporta. 2017;(45):32–42. (In Russ.)

11. Тимухин С.А., Долганов А.В., Попов Ю.В., Чураков Е.О., Ислентьев А.О., Торопов Э.Ю. О разработке шахтных центробежных секционных двухпоточных насосов. Известия Уральского государственного горного университета. 2014;(2):41–44.Timukhin S.A., Dolganov A.V., Popov Yu.V., Churakov E.O., Islentyev A.O., Toropov E.Yu. On the development of the mine sectional centrifugal dual-stream pumps. News of the Ural State Mining University. 2014;(2):41–44. (In Russ.)

12. Тимухин С.А., Чураков Е.О., Ислентьев А.О. Оценка напряженно-деформированного состояния валов шахтных секционных насосов. Известия Уральского государственного горного университета. 2017;(2):75–77. Timukhin S.A., Churakov E.O., Islent’ev A.O. Evaluation of the stress-strain state of shafts of mine section pumps. News of the Ural State Mining University. 2017;(2):75–77. (In Russ.)

13. Овчинников Н.П. Об одной из причин нарушения надежной и безопасной работы рудничной водоотливной установки. Безопасность труда в промышленности. 2022;(2):76–80. https://doi.org/10.24000/0409-2961-2022-2-76-80Ovchinnikov N.P. On one of the reasons for the violation of the reliable and safe operation of the mine drainage system. Occupational Safety in Industry. 2022;(2):76–80. (In Russ.) https://doi.org/10.24000/0409-2961-2022-2-76-80