Abstract: The paper presents a methodology for determining rational tooth spacing of a woody debris grubber during peatland development using the bulldozer multilayer stripping method. The relevance of the study is justified by the need to normalize loads on the process equipment and prevent woody residues from passing between the working attachments, since the specific cutting resistance of woody debris is 70 times higher than that of the peat bed. The purpose of this study is to provide a methodological basis for defining the cutting width of the woody debris grubber. Field studies and sampling of the woody inclusions were carried out at the Zaozerskoye deposit in the Leningrad Region. The probing rod method was used on the site to determine the stump density of 1% using and the woody debris detection frequency of 5.5%. A total of 86 woody debris samples were extracted and classified into six distinct morphological groups. Significant overall dimensions were determined for each group. Statistical processing was performed using the cluster analysis, the Kruskal–Wallis test, and the Tukey’s HSD. It was found that distribution of the woody debris by length is governed by the normal probability law (the variation coefficient of 0.22–0.38), whereas its distribution by the width (the variation coefficient of 0.29–0.56) fails to be normal. A high statistical similarity in the overall dimensions between the groups was revealed with respect to the width. The average length of the woody inclusions was 0.87 m, the average width being 0.33 m. The following rational layout of the teeth is proposed for a front-mounted grubber with the working width of 4.26 m: the tooth spacing of 330 mm, the number of teeth being 13 pieces

Keywords: bulldozer technology, peat deposits, multilayer stripping method, stump density, woody inclusions, grubbing

Acknowledgements: This work was carried out within the framework of a state assignment from the Ministry of Science and Higher Education of the Russian Federation (Study of the processes of integrated development of the Earth’s interior and deep processing of geological resources, project No. FSRW-2026-0003).

For citation: Kazakov Yu.A., Zhigulskaya A.I. Methodology to determine tooth spacing for a woody debris grubber. Russian Mining Industry. 2026;(4S):99–104. (In Russ.) https://doi.org/10.30686/1609-9192-2026-4S-99-104


Article info

Received: 24.06.2026

Revised: 29.07.2026

Accepted: 18.08.2026


Information about the authors

Yury A. Kazakov – Cand. Sci. (Eng.), Assistant of Mechanical Engineering Department, Empress Catherine II Saint Petersburg Mining University, Saint Petersburg, Russian Federation; e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it..

Alexandra I. Zhigulskaya – Cand. Sci. (Eng.), Associate Professor, Department of Technological Machines and Equipment, Tver State Technical University, Tver, Russian Federation; e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it..


References

1. Litvinenko V.S., Petrov E.I., Vasilevskaya D.V., Yakovenko A.V., Naumov I.A., Ratnikov M.A. Assessment of the role of the state in the management of mineral resources. Journal of Mining Institute. 2023;259:95–111. https://doi.org/10.31897/PMI.2022.100

2. Litvinenko V.S., Dvoynikov M.V., Trushko V.L. Elaboration of a conceptual solution for the development of the Arctic shelf from seasonally flooded coastal areas. International Journal of Mining Science and Technology. 2022;32(1):113–119. https://doi.org/10.1016/j.ijmst.2021.09.010

3. Nurmi P. Green mining – a holistic concept for sustainable and acceptable mineral production. Annals of Geophysics. 2017;60(7):1–7. https://doi.org/10.4401/ag-7420

4. Volkodaeva M.V., Kiselev A.V. On development of system for environmental monitoring of atmospheric air quality. Journal of Mining Institute. 2017;227:589–596. https://doi.org/10.25515/PMI.2017.5.589

5. Misnikov O.S., Timofeev A.E. On rational use of the energy and mineral resources of peat deposits. Gornyi Zhurnal. 2008;(11):59–63. Available at: https://www.rudmet.ru/journal/735/article/10187/ (accessed: 29.03.2026).

6. Mikhailov A.V., Zhigulskaya A.I., Kazakov Yu.A. Rational technology for integrated mining of peat deposits. Russian Mining Industry. 2024;(1):66–69. https://doi.org/10.30686/1609-9192-2024-1-66-69

7. Тюремнов С.Н., Ларгин И.Ф., Ефимова С.Ф., Скобеева Е.И. Торфяные месторождения и их разведка. М.: Недра; 1977. 264 с.

8. Kholodnyakov G.A., Argimbaev K.R. Open mining technique for unconventional mineral deposits. Journal of Mining Institute. 2015;216:82–88. Available at: https://pmi.spmi.ru/pmi/article/view/5169 (accessed: 29.03.2026).

9. Shumilova L.V. Geotechnology-based technical integration strategy for territorial industrial systems. Mining Informational and Analytical Bulletin. 2021;(5):68–84. https://doi.org/10.25018/0236_1493_2021_5_0_68

10. Mikhailov А.V., Smirnov A.I. Digging method analyzing organogenic materials mining by in-pit method. Mining Informational and Analytical Bulletin. 2026;(2-1):197–209. Available at: https://giab-online.ru/files/Data/2026/2-1/2-1_2026_197-209.pdf (accessed: 23.01.2026).

11. Babyr N.V., Kuziev D.A., Sazankova E.S., Dobler M.O. Influence of cyclic impacts of powered roof support on weakening of immediate roof rocks. Eurasian Mining. 2026;(1):14–19. Available at: https://www.rudmet.ru/journal/2523/article/41017/ (accessed: 09.04.2026).

12. Tien D.L., Trung T.V., Anh S.D., Babyr N.V. Ground pressure and methods to enhance roof stability in mechanized coal mining. International Journal of Engineering, Transactions A: Basics. 2026;39(4):862–869. https://doi.org/10.5829/ije.2026.39.04a.05

13. Drebenstedt C. The responsible mining concept – contributions on the interface between science and practical needs. In: Drebenstedt C., Singhal R. (eds) Mine Planning and Equipment Selection: Proceedings of the 22nd MPES Conference, Dresden, 14–19 October 2013. Cham: Springer; 2014, pp. 3–24. https://doi.org/10.1007/978-3-319-02678-7_1

14. Shishlyannikov D.I., Ivanov S.L., Zvonarev I.E., Zverev V.Yu. Improving efficiency of shearing and hauling machines in longwall potash mining. Mining Informational and Analytical Bulletin. 2020;(9):116–124. https://doi.org/10.25018/0236-1493-2020-9-0-116-124

15. Yusov D.S., Ivanova P.V., Ivanov S.L. Systematization of end effectors of deep milling machines for peat extraction. Russian Mining Industry. 2024;(3):85–89. https://doi.org/10.30686/1609-9192-2024-3-85-89

16. Plaschinsky V.A., Sheshukova E.I., Salimov A.E., Shibanov D.A., Ivanov S.L. Numerical simulation of the digging process with an excavator bucket using the discrete element method. Russian Mining Industry. 2025;(4):144–150. https://doi.org/10.30686/1609-9192-2025-4-144-150

17. Vagapova E. A., Ivanova P. V. Complex of hydromechanized extraction and gasification of peat raw materials for remote and hard-to-reach regions. Mining Informational and Analytical Bulletin. 2026;(5):66–79. Available at: https://giab-online.ru/files/Data/2026/5/05_2026_66-79.pdf (accessed: 29.03.2026).

18. Adamsson L. Peat stratigraphical study of hydrological conditions at Stass Mosse, southern Sweden, and the relation to Holocene bog-pine growth [Master’s thesis, No. 343]. Department of Geology Lund University; 2013. 30 p. Available at: https://lup.lub.lu.se/student-papers/search/publication/3807020 (accessed: 29.03.2026).

19. Edvardsson J., Leuschner H.H., Linderson H., Linderholm H.W., Hammarlund D. South Swedish bog pines as indicators of Mid-Holocene climate variability. Dendrochronologia. 2012;30(2):93–103. https://doi.org/10.1016/j.dendro.2011.02.003

20. Zyuzin B.F., Yakonovskaya T.B., Zhigulskaya A.I. A systematic approach to the peat machines and equipment classification development. Mining Science and Technology (Russia). 2022;7(4):320–329. https://doi.org/10.17073/2500-0632-2022-06-06

21. Kuvshinkin S., Ivanova P. Impact analysis of bucket capacity and boom length of mining excavators on hoisting mechanism life. E3S Web of Conferences. 2021;326:00032. https://doi.org/10.1051/e3sconf/202132600032

22. Scott B., Ranjith P.G., Choi S.K., Khandelwal M. A review on existing opencast coal mining methods within Australia. Journal of Mining Science. 2010;46(3):280–297. https://doi.org/10.1007/s10913-010-0036-3

23. Zadkov D.A., Martyushev N.V., Malozyomov B.V., Demin A.Y., Pogrebnoy A.V., Kuleshova E.E., Valuev D.V. Mathematical modeling of operational reliability of mine lifting equipment based on censored data. Mathematics. 2026;14(4):716. https://doi.org/10.3390/math14040716

24. Gabov V. V., Zadkov D. A., Pryaluhin A. F., Sadovsky M. V., Molchanov V. V. Mining combine screw executive body design. Mining Informational and Analytical Bulletin. 2023;(11-1):51–71. https://doi.org/10.25018/0236_1493_2023_111_0_51

25. Korolev R.I., Urazov D.V., Yungmeyster D.A., Serzhan S.L., Fedorov E.V. System for layer-by-layer mechanized backfill of mined-out spaces for the disposal of processing waste. Obogashchenie Rud. 2025;(6):47–52. https://doi.org/10.17580/or.2025.06.09

26. Botyan E.Y., Nikolaichuk L.А., Martemyanova А.N., Stepuk Е.I., Pushkarev А.Е. Improving the approach to the organization of technical repairs of dump trucks using remote monitoring systems of their nodes. Mining Informational and Analytical Bulletin. 2025;(12-2):137–152. Available at: https://giab-online.ru/files/Data/2025/12-2/12-2_2025_137-152.pdf (accessed: 07.04.2026).

27. Khamidov O.U., Shibanov D.A. Regulated maintenance and repair of quarry excavators considering real-world conditions and operating modes. Mining Informational and Analytical Bulletin. 2025;(12-3):152–167. https://doi.org/10.25018/0236_1493_2025_123_0_152

28. Катаев А.В., Кутовой С.Н. Прикладной статистический анализ в горном деле (многомерная математическая статистика). Пермь: Изд-во Пермского нац. исслед. политехнического ун-та; 2022. 318 с.

29. Keksin A.I., Filipenko I.A., Sorokopud N.I., Ovsyannikov D.A. Effect of process parameters of magnetic abrasive finishing on productivity while ensuring surface quality of electrical engineering products. International Journal of Engineering, Transactions B: Applications. 2026;39(11):2815–2823. https://doi.org/10.5829/ije.2026.39.11b.13

30. Maksarov V.V., Keksin A.I., Filipenko I.A. Improvement of magnetic-abrasive finishing of nonuniform products made of high-speed steel in digital conditions. Key Engineering Materials. 2020;836:71–77. https://doi.org/10.4028/www.scientific.net/KEM.836.71

31. Unguryanu T.N., Grjibovski A.M. Analysis of three independent groups using non-parametric Kruskal-Wallis test in STATA software. Ekologiya cheloveka (Human Ecology). 2014;21(6):55–58. https://doi.org/10.17816/humeco17232

32. Allam I.M.A. Implementation and comparative analysis of Tukey’s honestly significant difference (HSD) test following Anova in Python and C. https://doi.org/10.13140/RG.2.2.24468.87683