Methodology for determining the optimal parameters of a rock release trench in the combined mining system for gently dipping deposits
Yu.G. Antipin, A.A. Smirnov, I.V. Nikitin, Yu.M. Solomein
Institute of Mining Ural Branch of Russian Academy of Sciences, Ekaterinburg, Russian Federation
Russian Mining Industry №5 / 2024 p.116-121
Abstract: A specific feature of combined mining systems in conditions of flat deposits of medium thickness is the need to form an ore release trench from the interchamber pillar in the underlying rocks. The volume of the release trench is one of the main factors affecting the efficiency of the combined mining system. Reducing the slope angle and the height of the release trench, on the one hand, allows reducing operating costs for breaking, releasing and delivering ore, caving of overlying rocks, on the other hand, leads to deterioration in ore extraction indicators. Determining the optimal parameters of the release trench depending on the width of the interchamber pillar is an urgent scientific and technical task. To solve it, a methodology has been developed for assessing the efficiency and determining the optimal parameters of the rock release trench based on the profit criterion per 1 ton of the recovered balance reserves, including the established functional dependencies of ore extraction indicators and the operating costs for the main technological processes of ore mining on the thickness and the dip angle of the deposit, the width of the interchamber pillar, the slope angle and the height of the release trench. It has been established that the optimal slope angle and height of the release trench with an interchamber pillar width of 8–18 m are 65° and 4.8–16.1 m, with a width of 18–20 m – 60° and 13.2–15.1 m, respectively.
Keywords: flat deposit, combined mining system, interchamber pillar, release trench, extraction indicators, operating costs
Acknowledgments: fThe work was carried out under the state assignment of the RF Ministry of Science and Higher Education №075-00412-22 PR. Topic 1. FUWE-2022-0005.
For citation: Antipin Yu.G., Smirnov A.A., Nikitin I.V., Solomein Yu.M. Methodology for determining the optimal parameters of a rock release trench in the combined mining system for gently dipping deposits. Russian Mining Industry. 2024;(5S):116–121. (In Russ.) https://doi.org/10.30686/1609-9192-2024-5S-116-121
Article info
Received: 18.08.2024
Revised: 02.10.2024
Accepted: 08.10.2024
Information about the authors
Yuri G. Antipin – Cand. Sci. (Eng.), Laboratory Сhief, Institute of Mining Ural Branch of RAS, Ekaterinburg, Russian Federation; https://orcid.org/0000-0002-3564-0310; e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Alexey A. Smirnov – Cand. Sci. (Eng.), Senior Scientific Researcher, Institute of Mining Ural Branch of RAS, Ekaterinburg, Russian Federation; e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Igor V. Nikitin – Scientific Researcher, Institute of Mining Ural Branch of RAS, Ekaterinburg, Russian Federation; e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Yuri M. Solomein – Scientific Researcher, Institute of Mining Ural Branch of RAS, Ekaterinburg, Russian Federation; e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
References
1. Яковлев В.Л. Основные этапы и результаты исследований по разработке методологических основ стратегии развития горнотехнических систем при освоении глубокозалегающих месторождений твердых полезных ископаемых. Горная промышленность. 2022;(1S):34–45. https://doi.org/10.30686/1609-9192-2022-1S-34-45 Yakovlev V.L. Key stages and results of research to formulate methodological basis for the strategy to develop mining systems for deep seated deposits of solid minerals. Russian Mining Industry. 2022;(1 Suppl.):34–45. (In Russ.) https://doi.org/10.30686/1609-9192-2022-1S-34-45
2. Габараев О.З., Кожиев Х.Х., Хулелидзе К.К., Битаров В.Н. Ресурсосберегающие технологии закладки выработанного пространства при добыче богатых медно-никелевых руд. Устойчивое развитие горных территорий. 2012;4(4):31–34. Режим доступа: http://naukagor.ru/ru-ru/articles/ArtMID/2504/ArticleID/328/site-map (дата обращения: 13.09.2024). Gabaraev O.Z., Kozhiev K.K., Khulelidze K.K., Bitarov V.N. Resource-saving technologies backfilling during the mining of valuable copper-nickel ores. Sustainable Development of Mountain Territories. 2012;4(4):31–34. (In Russ.) Available at: http://naukagor.ru/ru-ru/articles/ArtMID/2504/ArticleID/328/site-map (accessed: 13.09.2024).
3. Balt K., Goosen R.L. MSAHP: An approach to mining method selection. Journal of the Southern African Institute of Mining and Metallurgy. 2020;120(8):451–460. https://doi.org/10.17159/2411-9717/1072/2020
4. Лукичёв С.В., Любин А.Н. Повышение полноты извлечения и качества руд при разработке тонких пологих месторождений. Проблемы недропользования. 2016;(4):69–73. https://doi.org/10.18454/2313-1586.2016.04.069 Lukichev S.V., Ljubin A.N. Increase of ore extraction and quality when developing thin flat deposits. Problems of Subsoil Use. 2016;(4):69–73. (In Russ.) https://doi.org/10.18454/2313-1586.2016.04.069
5. Никольский А.М., Неверов С.А., Неверов А.А., Тишков М.В., Семенов Д.П. Обоснование конструкций днищ блоков при системах разработки с камерно-целиковым порядком выемки. Горный информационно-аналитический бюллетень. 2018;(4):36–44. Режим доступа: https://giab-online.ru/files/Data/2018/4/36_44_4_2018.pdf (дата обращения: 13.09.2024). Nikolsky A.M., Neverov S.A., Neverov A.A., Tishkov M.V., Semenov D.P. Evaluation of bottom designs for extraction blocks in room-and-pillar mining. Mining Informational and Analytical Bulletin. 2018;(4):36–44. (In Russ.) Available at: https://giabonline.ru/files/Data/2018/4/36_44_4_2018.pdf (accessed: 13.09.2024).
6. Неверов А.А. Геомеханическое обоснование нового варианта камерной выемки пологих мощных залежей с выпуском руды из подконсольного пространства. Физико-технические проблемы разработки полезных ископаемых. 2012;(6):87–97. Neverov A.A. Geomechanical substantiation of modified room-work in flat thick deposits with ore drawing under overhang. Journal of Mining Science. 2012;48(6):1016–1024. https://doi.org/10.1134/S1062739148060093
7. Соколов И.В., Антипин Ю.Г., Никитин И.В., Криницын Р.B. Обоснование конструкции и параметров комбинированной системы разработки пологой залежи бедных комплексных руд. Горный информационно-аналитический бюллетень. 2021;(5-1):88–104. https://doi.org/10.25018/0236_1493_2021_51_0_88 Sokolov I.V., Antipin Yu.G., Nikitin I.V., Krinitsyn R.V. Justification of design and parameters of mixed mining system for gently dipping low-grade complex ore body. Mining Informational and Analytical Bulletin. 2021;(5-1):88–104. (In Russ.) https://doi.org/10.25018/0236_1493_2021_51_0_88
8. Соколов И.В., Антипин Ю.Г., Барановский К.В., Рожков А.А., Никитин И.В. Пути повышения эффективности подземной разработки пологих месторождений бедных комплексных руд. Проблемы недропользования. 2022;(4):33–43. https://doi.org/10.25635/2313-1586.2022.04.033 Sokolov I.V., Antipin Yu.G., Baranovsky K.V., Rozkov A.A., Nikitin I.V. Ways to improve the efficiency of underground mining of gently sloping deposits of low-grade complex ores. Problems of Subsoil Use. 2022;(4):33–43. (In Russ.) https://doi.org/10.25635/2313-1586.2022.04.033
9. Павленко С.В., Котов А.А. Система дистанционного управления погрузочно-доставочной машиной при подэтажном торцевом выпуске руды на подземном руднике «Удачный». Горный информационно-аналитический бюллетень. 2022;(S6):3–10. Pavlenko C.V., Kotov A.A. The system of remote control of the loading and delivery machine at the underground end ore release at the Udachny underground mine. Mining Informational and Analytical Bulletin. 2022;(S6):3–10. (In Russ.)
10. Shimaponda-Nawa M., Nwaila G.T. Integrated and intelligent remote operation centres (I2ROCs): Assessing the human– machine requirements for 21st century mining operations. Minerals Engineering. 2024;207:108565. https://doi.org/10.1016/j.mineng.2023.108565
11. Gaber T., El Jazouli Y., Eldesouky E., Ali A. Autonomous haulage systems in the mining industry: Cybersecurity, communication and safety issues and challenges. Electronics. 2021;10(11):1357. https://doi.org/10.3390/electronics10111357
12. Yu H., Zhao C., Li S., Wang Z., Zhang Y. Pre-Work for the birth of driver-less scraper (LHD) in the underground mine: The path tracking control based on an LQR controller and algorithms comparison. Sensors. 2021;21(23):7839. https://doi.org/10.3390/s21237839
13. Соколов И.В., Антипин Ю.Г., Никитин И.В. Методология выбора подземной геотехнологии при комбинированной разработке рудных месторождений. Екатеринбург: Изд-во Уральского университета; 2021. 340 с.
14. Барановский К.В., Антонов В.А., Соколов И.В. Закономерности изменения потерь и разубоживания в комбинированной системе подземной добычи кварцевого сырья. Проблемы недропользования. 2017;(1):29–37. https://doi.org/10.18454/2313-1586.2017.01.029 Baranovsky K.V., Antonov V.A., Sockolov I.V. The regularities of variation losses and dilution in the combined system of quartz raw material mining. Problems of Subsoil Use. 2017;(1):29–37. (In Russ.) https://doi.org/10.18454/2313-1586.2017.01.029