Upgrading effector design for heading machine used for tunneling in complex rocks during construction of St. Petersburg metro

DOI: https://doi.org/10.30686/1609-9192-2026-4S-165-171

Читать на русскоя языкеD.A. Yungmeister1, M.I. Timofeev1, R.I. Korolev2
1  Empress Catherine II Saint Petersburg Mining University, Saint Petersburg, Russian Federation
2  ProTech Engineering LLC, Saint Petersburg, Russian Federation
Russian Mining Industry №4S/ 2026 p. 165-171

Abstract: The authors propose an upgraded effector for heading machines designed for the specific mining and geological conditions of St. Petersburg as a solution to the problem of reducing emergency failures of tunneling equipment. The article discusses options for fitting the effectors of mechanized tunnel-boring complexes with vibroactive roller cutters and combined cutters (a cutting blade combined with a roller cutter) that automatically alternate between the functions depending on the properties of the rock being removed. The required characteristics of the vibroactive roller cutters and the design features of the combined cutters with a rock chipper have been determined. It has been proved that implementation of the proposed solutions will reduce the emergency downtime by 30% and eliminate the risks of tunnel workers operating in hazardous conditions of the tunnel face collapse. A theoretical justification of the system’s dynamic parameters was performed using differential simulation. The authors propose a mathematical model of the cutting assembly dynamics. A physical experiment was performed using a Zwick Roell Z100 testing machine to verify the parameters and define the limiting cutting forces. A dedicated laboratory prototype of the rock-cutting tool was designed and manufactured for the tests. Continuous strain gauge measurements of the forces acting on the cutter were recorded during the experiment. The obtained values were fitted to the Drucker–Prager elastic-plastic model for numerical simulation of the stress-strain state of the rock mass using the ANSYS software suite. According to preliminary estimates, use of the heading machines equipped with the proposed upgraded rock-cutting tools will increase the tunneling speed while reducing maintenance costs for the working equipment by at least 20%.

Keywords: tunnel boring machine, rock-cutting tools, vibroactive roller cutter, cutter, complex rocks, tunneling speed, emergency downtime

For citation: Yungmeister D.A., Timofeev M.I., Korolev R.I. Upgrading effector design for heading machine used for tunneling in complex rocks during construction of St. Petersburg metro. Russian Mining Industry. 2026;(4S):165–171. (In Russ.) https://doi.org/10.30686/1609-9192-2026-4S-165-171


Article info

Received: 30.05.2026

Revised: 29.07.2026

Accepted: 20.08.2026


Information about the authors

Dmitrii A. Yungmeister – Dr. Sci. (Eng.), Professor of the Department of Mechanical Engineering, Empress Catherine II Saint Petersburg Mining University, Saint Petersburg, Russian Federation; https://orcid.org/0000-0001-7858-8340

Maksim I. Timofeev – Postgraduate Student of the Department of Mechanical Engineering, Empress Catherine II Saint Petersburg Mining University, Saint Petersburg, Russian Federation; https://orcid.org/0000-0002-9441-4532; e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

Roman I. Korolev – Cand. Sci. (Eng.), Chief Specialist of the Mining and Mechanical Sector of the Mining Design Department of the St. Petersburg branch, ProTech Engineering LLC, Saint Petersburg, Russian Federation; https://orcid.org/0000-0001-5247-9453


References

1. Rostami J. Performance prediction of hard rock Tunnel Boring Machines (TBMs) in difficult ground. Tunnelling and Underground Space Technology. 2016;57:173–182. https://doi.org/10.1016/j.tust.2016.01.009

2. Mandaglio M.C. Geomechanical characterization of the rock mass along a deep vertical borehole. Geotechnics. 2024;4(1):209–228. https://doi.org/10.3390/geotechnics4010011

3. Shaterpour-Mamaghani A., Copur H., Balci C., Tumac D., Kocbay A., Dogan E. et al. Suggestion of new models for predicting performance of raise boring machines based on indentation tests. Tunnelling and Underground Space Technology. 2023;138:105181. https://doi.org/10.1016/j.tust.2023.105181

4. Shangxin F., Zuyu C., Hua L., Shanyong W., Yufei Z., Lipeng L. et al. Tunnel boring machines (TBM) performance prediction: A case study using big data and deep learning. Tunnelling and Underground Space Technology. 2021;110:103636. https://doi.org/10.1016/j.tust.2020.103636

5. Shin Y.J., Farrokh E., Jung J., Kang H. Optimizing tunnel boring machine operations in real time within defined constraints. Journal of Construction Engineering and Management. 2025;151(6):15962. https://doi.org/10.1061/JCEMD4.COENG-15962

6. Mostafa S., Sousa R.L. Deep learning uncertainty quantification for enhancing TBM operational predictions. Geodata and AI. 2024;1:100003. https://doi.org/10.1016/j.geoai.2025.100003

7. Xie W., Liu X., Zhang C., Zhou X., Chen J. Response law of rock-cutterhead interaction in intact sandstone through TBM tunnelling test. Underground Space. 2026;26:152–174. https://doi.org/10.1016/j.undsp.2025.06.006

8. Yang Z., Wang L., Zhou J., Li D., Zhang K., Guo X. Mechanical characteristics of a tunnel boring machine cutterhead during rock breaking: Physical model tests and transient dynamic analysis. Advances in Mechanical Engineering. 2023;15(3):16878132231159971. https://doi.org/10.1177/1687813223115997

9. Chakeri H., Darbor M., Shakeri H., Mousapour H., Mohajeri V. Experimental and numerical investigation of the TBM disc cutter wear using a new tunnel boring machine laboratory simulator. Heliyon. 2024;10(17):e37148. https://doi.org/10.1016/j.heliyon.2024.e37148

10. Babyr N.V., Kuziev D.A., Sazankova E.S., Dobler M.O. Influence of cyclic impacts of powered roof support on weakening of immediate roof rocks. Eurasian Mining. 2026;(1):14–19. Available at: https://www.rudmet.ru/journal/2523/article/41017/ (accessed: 21.03.2026).

11. Jing B.-X., Gao X.-Q., Yang Z.-G., Yang T.-J., Meng X.-Y., Liu Y.-B. Dynamic risk assessment and mitigation effect evaluation of TBM jamming based on BPNN-BN coupling model. Scientific Reports. 2026;16:21813. https://doi.org/10.1038/s41598-026-52655-9

12. Yu Z., Li C., Zhou J. Tunnel boring machine performance prediction using supervised learning method and swarm intelligence algorithm. Mathematics. 2023;11(20):4237. https://doi.org/10.3390/math11204237

13. Вербило П.Э., Карасев М.А., Шишкина В.С. Прогноз геомеханического состояния структурно нарушенных породных целиков с учетом запредельного их деформирования. Горный журнал. 2025;(3):41–47. https://doi.org/10.17580/gzh.2025.03.06

14. Yang Z., Liu Y., Chen C. Correlation analysis of tunnel deformation and internal force in the earthquake based on tunnel inclination. Buildings. 2024;14(5):1395. https://doi.org/10.3390/buildings14051395

15. Александрова Т.Н., Люблянова В.А. Повышение извлечения меди из медных минералов при сернокислотном выщелачивании. Обогащение руд. 2025;(6):16–21. https://doi.org/10.17580/or.2025.06.03

16. Сержан С.Л., Малеванный Д.В. Современное состояние и перспективы развития технологий подъема для комплексов добычи глубоководных твердых полезных ископаемых. Горный информационно-аналитический бюллетень. 2024;(12-1):107–128. https://doi.org/10.25018/0236_1493_2024_121_0_107

17. Ads A., Islam S., Iskander M. Longitudinal settlements during tunneling in soft Clay, using transparent soil models. Tunnelling and Underground Space Technology. 2023;136:105042. https://doi.org/10.1016/j.tust.2023.105042

18. Wang F., Du X., Li P. Predictions of ground surface settlement for shield tunnels in sandy cobble stratum based on stochastic medium theory and empirical formulas. Underground Space. 2023;(11):189–203. https://doi.org/10.1016/j.undsp.2023.01.003

19. Malsam A., Walton G. Seasonality of rockfall triggers and conditioning factors interpreted from a lidar-derived rockfall database. Engineering Geology. 2024;333:107500. https://doi.org/10.1016/j.enggeo.2024.107500

20. Ouadfel K., Messast S., Boulfoul K. Seismic response of undrained twin tunnels. Journal of Mining Science. 2022;58(2):192–201. https://doi.org/10.1134/S106273912202003X

21. Юнгмейстер Д.А., Уразбахтин Р.Ю., Тимофеев М.И., Лавренко С.А. Моделирование и оптимизация использования проходческих комплексов при строительстве вспомогательных выработок. Горный информационно-аналитический бюллетень. 2025;(12-3):117–135. https://doi.org/10.25018/0236_1493_2025_123_0_117

22. Юнгмейстер Д.А., Уразбахтин Р.Ю., Нгуен К.Л., Тимофеев М.И. Комплекс для создания хранилищ особо опасных отходов: обоснование конструкции и параметров. Обогащение руд. 2023;(6):47–51. https://doi.org/10.17580/or.2023.06.08

23. Муминов Р.О., Рузибаев А.Н., Жураев Н.Н., Равшанов Ж.P., Кузиев Д.А. Разработка мероприятий по совершенствованию вращательно-падающего механизма бурового станка. Уголь. 2024;(1):94–99. https://doi.org/10.18796/0041-5790-2024-1-94-99

24. Yu H., Bo Y., Liu Q., Yang X., Xu S., Monthly advance rate estimation of hard rock tunnel boring machine based on rock mass classification and data augmentation. Underground Space. 2025;23:175–192. https://doi.org/10.1016/j.undsp.2025.02.002

25. Жабин А.Б., Поляков А.В., Аверин Е.А. Сопоставление отечественных и зарубежных методов расчета усилий на лобовых дисковых шарошках при разрушении горных пород. Горный журнал. 2018;12:65–68. https://doi.org/10.17580/gzh.2018.12.13

26. Жабин А.Б., Лавит И.М., Поляков А.В., Керимов З.Э. Математическая модель разрушения горных пород ударным инструментом. Горный информационно-аналитический бюллетень. 2020;(11):140–150. https://doi.org/10.25018/0236-1493-2020-11-0-140-150

27. Азимов А.М., Жуков И.А. Повышение энергоэффективности гидромолотов, применяемых при разрушении негабаритов горных пород, на основе эффекта влияния геометрии элементов ударного узла. Горная промышленность. 2025;(3):71–79. https://doi.org/10.30686/1609-9192-2025-3-71-79

28. Ромашев А.О., Балашов А.О., Гатиатуллин Б.Л., Николаева Н.В. Исследование вибрационной сегрегации материала для интенсификации процесса грохочения. Обогащение руд. 2025;(4):8–14. https://doi.org/10.17580/or.2025.04.02

29. Ilyushin Y.V., Boronko E.A. Development of a mathematical model of the electromagnetic field formation process based on system analysis methods. Mathematics. 2026;14(3):399. https://doi.org/10.3390/math14030399

30. Симисинов Д.И., Волков Е.Б., Афанасьев А.И., Зубов В.В. Испытательный стенд для определения момента трения подшипника качения бурового шарошечного долота. Горный информационно-аналитический бюллетень. 2022;(11-2):106–113. https://doi.org/10.25018/0236_1493_2022_112_0_106

31. Жуков И.А., Верховский М.И. Перспективы применения планетарных механизмов в качестве исполнительных органов роботов-бурильщиков. Горный информационно-аналитический бюллетень. 2025;(12-3):23–36. https://doi.org/10.25018/0236_1493_2025_123_0_23

32. Хамидов О.У., Шибанов Д.А. Техническое обслуживание и ремонт карьерных экскаваторов по регламенту с учетом фактических условий и режимов их эксплуатации. Горный информационно-аналитический бюллетень. 2025;(12-3):152–167. https://doi.org/10.25018/0236_1493_2025_123_0_152

33. Huang H., Sun Q., Xu T., Zhou W. Mechanism analysis of foam penetration in EPB shield tunnelling with a focus on FER and soil particle size. Underground Space. 2024;17:170–187. https://doi.org/10.1016/j.undsp.2023.11.012

34. Ye X., Wang S., Yang J., Sheng D., Xiao C. Soil Conditioning for EPB shield tunneling in argillaceous siltstone with high content of clay minerals: Case study. International Journal of Geomechanics. 2017;17(4):05016002. https://doi.org/10.1061/(ASCE)GM.1943-5622.0000791

35. Lee H., Kim H.K., Hwang B., Yoon Y., Choi H. Coupled DEM-FDM numerical model for EPB shield tunnelling simulation with foam conditioning. Tunnelling and Underground Space Technology. 2024;147:105718. https://doi.org/10.1016/j.tust.2024.105718

36. Aleksandrova T., Gatiatullin B., Kuznetsov V., Nikita S. Evaluation methods for aeration parameters in flotation separation modelling with neural network applications. Processes. 2026;14(4):728. https://doi.org/10.3390/pr14040728

37. Evdokimov S.I., Golikov N.S., Zadkov D.A., Voitovich E.V., Kondratiev V.V., Petrovskiy A.A. et al. Studying the flotation of goldbearing ores using carrier minerals. Minerals. 2024;14(1):88. https://doi.org/10.3390/min14010088

38. Yao X., Lv K., He J., Ren T., Ye C. Regulating the rheology of drilling fluids under high-temperature conditions with hydrophobically associating polymers. Polymers. 2026;18(7):859. https://doi.org/10.3390/polym18070859

39. Carigi A., Saltarin S., Di Giovanni A., Todaro C., Peila D. Reuse of EPB mucking for concrete production: A laboratory test campaign. Case Studies in Construction Materials. 2023;18:e02187. https://doi.org/10.1016/j.cscm.2023.e02187

40. Михайлов А.В., Смирнов А.И. Анализ метода выемки торфяного сырья с откоса карьера. Горный информационно-аналитический бюллетень. 2026;(2-1):197–209. Режим доступа: https://giab-online.ru/files/Data/2026/2-1/2-1_2026_197-209.pdf (дата обращения: 15.03.2026).