Abstract: Nowadays, it is difficult to imagine an open-pit mining (OPM) enterprise without an automated dispatching system operating in it, which provides control over the operation of technological shovel-truck systems (STS). The objective of this article is to review and document the mine dispatching systems' (DS) models and algorithms. The purpose is to understand these algorithms and the proposed academic solutions in this area to identify any gaps in the current literature and to open up opportunities to establish research questions that need to be addressed in an integrated simulation and optimization operational planning research framework. In this article, we review industrial mine dispatching systems and the main academic models behind such systems. The dispatching systems are divided into three subsequently related problems to review: the shortest path, production optimization and real-time dispatching. Finally, the limitations of current algorithms for dispatching systems are documented in terms of mining practice feasibility and optimality of the solution on large-scale problems. The results of this literature review enable us to evaluate the logical links between major components of an integrated simulation and optimization operational planning framework with current theory of mine dispatching systems.

Keywords: open-pit mine, shovel-truck system, management, dispatching, modeling, optimization

Acknowledgements: This work was financially supported by the Ministry of Science and Higher Education of Russian Federation under Agreement №075-15-2022-1198 dated 30.09.2022 with the Gorbachev Kuzbass State Technical University on complex scientific and technical program of full innovation cycle: "Development and implementation of complex technologies in the areas of exploration and extraction of solid minerals, industrial safety, bioremediation, creation of new deep conversion products from coal raw materials while consistently reducing the environmental impact and risks to human life" (the "Clean Coal - Green Kuzbass" Integrated Scientific and Technical Programme of the Full Innovation Cycle) as part of implementing the project "Development and creation of an unmanned shuttle-type mine truck with a payload of 220 tonnes" in terms of research, development and experimental-design work.

For citation: Voronov A.Y., Dubinkin D.M., Voronov Y.Y. An overview of models for truck dispatching in open-pit mines. Russian Mining Industry. 2022;(6):111–121. https://doi.org/10.30686/1609-9192-2022-6-111-121


Article info

Received: 29.10.2022

Revised: 17.11.2022

Accepted: 19.11.2022


Information about the authors

Artyom Y. Voronov – Cand. Sci. (Eng.), Assistant Professor, T.F. Gorbachev Kuzbass State Technical University, Kemerovo, Russian Federation

Dmitry M. Dubinkin – Cand. Sci. (Eng.), Assistant Professor, T.F. Gorbachev Kuzbass State Technical University, Kemerovo, Russian Federation; https://orcid.org/0000-0002-8193-9794; e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

Yuri Y. Voronov – Dr. Sci. (Eng.), Professor, T.F. Gorbachev Kuzbass State Technical University, Kemerovo, Russian Federation


References

1. Dubinkin D.M. Method of determining the loads acting during loading and unloading of the cargo platform (body) career self-dump. Mining Equipment and Electromechanics. 2022;(3):31–49. (In Russ.) https://doi.org/10.26730/1816-4528-2022-3-31-49

2. Dubinkin D.M. Justification of the need to create heavy platforms for open-pit mining. Mining Equipment and Electromechanics. 2022;(2):39–50. (In Russ.) https://doi.org/10.26730/1816-4528-2022-2-39-50

3. Khoreshok A.A., Dubinkin D.M., Markov S.O., Tyulenev M.A. On changes of efficient productivity of excavators when using dump trucks with different body capacity. Bulletin of the Kuzbass State Technical University. 2021;(6):85–93. (In Russ.) https://doi.org/10.26730/1999-4125-2021-6-85-93

4. Munirathinam M., Yingling J.C. A review of computer-based truck dispatching strategies for surface mining operations. International Journal of Surface Mining, Reclamation and Environment. 1994;8(1):1–15. https://doi.org/10.1080/09208119408964750

5. Alarie S., Gamache M. Overview of solution strategies used in truck dispatching systems for open pit mines. International Journal of Surface Mining, Reclamation and Environment. 2002;16(1):59–76. https://doi.org/10.1076/ijsm.16.1.59.3408

6. Olson J.P., Vohnout S.I., White J.W. On improving truck/shovel productivity in open pit mines. CIM Bulletin. 1993;86(973):43–49.

7. Hashemi A.S., Sattarvand J. Application of ARENA simulation software for evaluation of open pit mining transportation systems – a case study. In: Niemann-Delius, C. (eds) Proceedings of the 12th International Symposium Continuous Surface Mining – Aachen 2014. Lecture Notes in Production Engineering. Springer, Cham; 2015, pp. 213–224. https://doi.org/10.1007/978-3-319-12301-1_20

8. Kolonja В., Mutmansky J.M. Analysis of truck dispatching strategies for surface mining operations using SIMAN. SME Annual Meeting. 1993;296:1845–1851.

9. Afrapoli A.M., Askari-Nasab H. Mining fleet management systems: A review of models and algorithms. International Journal of Mining, Reclamation and Environment. 2019;33(1):42–60. https://doi.org/10.1080/17480930.2017.1336607

10. Hauck R.F. A real-time dispatching algorithm for maximizing open-pit mine production under processing and blending requirements. In: C. I. of M. and Metallurgy (ed.) Seminar on Scheduling in Mining, Smelting and Metallurgy. Montreal; 1973, pp. 1–10.

11. Soumis F., Ethier J., Elbrond J. Evaluation of the new truck dispatching in the Mount Wright mine. In: 21st APCOM Proceedings, 1989, pp. 674–682.

12. Dallaire R., Lapante A.R., Elbrond J. Humphrey’s spiral tolerance to feed vat-tact.cns. CIM Bulletin. 1978;76(796):128–134.

13. Barnes R.J., King M.S., Johnson T.B. Probability techniques for analyzing open pit production systems. In: 16th APCOM Proceedings, 1979, pp. 462–476.

14. Kappas G., Yegulalp T.M. An application of closed queueing networks theory in truck-shovel systems. International Journal of Surface Mining and Reclamation. 1991;5(1):45–53. https://doi.org/10.1080/09208119108944286

15. Najor J., Hagan P. Capacity constrained production scheduling. In: Cardu M., Ciccu R., Lovera E., Michelotti E. (eds). Proceedings of the 15th International Symposium on Mine Planning and Equipment Selection (MPES '06). Fiordo Srl, Torino, Italy; 2006, pp. 1173–1178.

16. Carmichael D.G. Engineering queues in construction and mining. Chichester: Ellis Horwood Ltd; 1987. 378 p.

17. Li Z. A methodology for the optimum control of shovel and truck operations in open-pit mining. Mining Science and Technology. 1990;10(3):337–340. https://doi.org/10.1016/0167-9031(90)90543-2

18. Bonates E. The development of assignment procedures for semi-automated truck/shovel system. PhD Thesis, McGill University, Montreal, Canada, 1992.

19. Temeng V., Otuonye F., Frendewey J. A nonpreemptive goal programming approach to truck dispatching in open pit mines. Mineral Resources Engineering. 1998;7(2):59–67. http://doi.org/10.1142/S0950609898000092

20. Ta C.H., Kresta J.V., Forbes J.F., Marquez H.J. A stochastic optimization approach to mine truck allocation. International Journal of Surface Mining, Reclamation and Environment. 2005;19(3):162–175. https://doi.org/10.1080/13895260500128914

21. Lizotte Y., Bonates E., Leclerc A. Design and implementation of a semi-automated truck/shovel dispatching system. In: 20th APCOM Proceedings. Johannesburg: SAIMM; 1987, pp. 377–387. Available at: https://www.saimm.co.za/Conferences/Apcom87Mining/377-Lizotte.pdf

22. Temeng V.A., Otuonye F.O., Frendewey J.O. Real-time truck dispatching using a transportation algorithm. International Journal of Surface Mining, Reclamation and Environment. 1997;11(4):203–207. https://doi.org/10.1080/09208119708944093

23. Askari-Nasab H., Frimpong S., Szymanski J. Modelling open pit dynamics using discrete simulation. International Journal of Mining, Reclamation and Environment. 2007;21(1):35–49. https://doi.org/10.1080/17480930600720206